First Lumen flight units delivered to launch integrator
May 14, 2026

Four Lumen nodes completed acceptance testing in April and shipped in May. Each unit deploys a 2.4 kW array and buries its own storage below the diurnal thermal wave.
The demonstration will establish a four-node mesh with site-wide timing to ±80 ns, the prerequisite for fusing observations across separate machines.


